+

Manohar Lal govt approves Rs 6,821 crore for Gurugram metro project

In order to provide Metro connectivity to the residents of old Gurugram, the Haryana Cabinet, which met under the chairmanship of Chief Minister Manohar Lal in Chandigarh on Thursday, accorded approval for final Detailed Project Report (DPR) of Metro Rail Connection from HUDA City Centre to various important locations in Gurugram at a cost Rs […]

Manohar Lal Khatter
Manohar Lal Khatter

In order to provide Metro connectivity to the residents of old Gurugram, the Haryana Cabinet, which met under the chairmanship of Chief Minister Manohar Lal in Chandigarh on Thursday, accorded approval for final Detailed Project Report (DPR) of Metro Rail Connection from HUDA City Centre to various important locations in Gurugram at a cost Rs 6,821.13 crore.

The total length of the corridor shall be about 28.80 km, consisting of 27 elevated stations with six interchange stations. This link would start at HUDA City Centre and move towards Sector 45, Cyber Park, District Shopping Centre, Sector 47, Subhash Chowk, Sector 48, Sector 72 A, Hero Honda Chowk, Udyog Vihar Phase 6, Sector 10, Sector 37, Basai village, Sector 9, Sector 7, Sector 4, Sector 5, Ashok Vihar, Sector 3, Bajghera Road, Palam Vihar Extension, Palam Vihar, Sector 23 A, Sector 22, Udyog Vihar Phase 4, Udyog Vihar Phase 5 and finally merge in existing metro network of Rapid Metrorail Gurugram, at Moulsar Avenue station near Cyber City. This Mass Rapid Transit System (MRTS) project will facilitate maximum part of Gurugram city. It will interchange with MRTS Corridor at Subhash Chowk, with Bus Stand at Sector 10, with Railway Station at Sector 5 and with Rapid Metro at Moulsar Avenue Station.

MRTS Corridor at Subhash Chowk will interchange with the yellow line at HUDA City Centre and, therefore, will provide direct connectivity to a large part of Gurugram with Delhi. It will also interchange with RRTS stations at Hero Honda Chowk and Sector-22 and will provide connectivity upto Sarai Kale Khan (SKK), New Delhi side and on one Shahjahanpur, Neemrana and Behror (SNB), Rajsathan on the other side. These linkages will enhance the efficiency of the transportation system in the National Capital Region (NCR). The daily ridership on the study corridor for the years 2025, 2031 and 2041 is expected to be 5.34 lakh passenger trips, 7.26 lakh passenger trips and 8.81 passenger trips respectively.

The introduction of MRTS will result in reduction in number of buses, Intermediate Public Transport (IPT), usage of private vehicles.

Tags: