(Refiles to remove extraneous text) * Trafigura not going ahead with its 2,000 MW link – sources * Angola seen as hub for surplus power to mining zone * Separate new lines to boost power supply to DRC
(The article has been published through a syndicated feed. Except for the headline, the content has been published verbatim. Liability lies with original publisher.)

