BELGRADE, July 25 (Reuters) – Serbia’s biggest hydropower plant, Djerdap 1, is producing only a third of its average daily output because the Danube river is at extremely low levels, as prolonged
(The article has been published through a syndicated feed. Except for the headline, the content has been published verbatim. Liability lies with original publisher.)

